About us
Quality
Environmental education
Virtual tour
Back to the homepage

Plant for mechanical treatment of wastes

The plant for mechanical treatment of wastes was created in 2005 within a mill, about 1,000 square meters. The plant lay-out, designed in conformity with the law in force, is set out in four different phases.

In the primary receiving phase, the incoming wastes are unloaded in a room inside the treatment plant in order to be collected and transferred to a grinding machine (grinding phase).

Afterwards, through the screening phase, the groundmaterial is separated further in two different fractions: a dry fraction (lightweight material with moisture content lower than 5%) and a wet fraction (heavy material with moisture content higher than 50%).

Lastly, through the loading phase, both the fractions incoming fromthe screening phase are handled and placed inside two self-compaction semitrailers. The compaction allows the waste be handled easily, so taking up lower space in the following collection phase.







Virtual Tour

Ecologica Sangro S.p.A. | P.iva 01404160697 | S.P. Pedemontana km. 10 s.n. | Cerratina 66034 Lanciano (CH) | T. +39 0872 713399 - 50627 | F. +39 0872 711888 - 508825 | made by Zetaweb